July 1, 2026
Interview with David Diez from ERZIA
Space-qualified RF hardware can take 2 years and cost 100x more than COTS. ERZIA’s New Space amplifier line closes that gap: radiation-tolerant, vacuum-ready, and delivered in as little as 3 days.
Our Managing Director, David DÃez breaks down the engineering approach and the market response in a recent interview with SatNow.